A development project involving approximately 2.50 kilometers of bridges spans
the Port-Said Canal from New Temsah Road to Madares Street. These bridges
feature continuous spans of pre-cast beams with a range of 25 to 50 meters. A
launching system was utilized for the installation of the pre-cast beams..