SAAD INTERNATIONAL
CONSULTANT ENGINEERS

26 July Corridor Extension

Egypt, Giza

26 July Corridor Extension

Gallery

About

26 July Corridor Extension

Extension of existing corridor with a length about 3-kilometer connecting the eastern and western Nile Roads. The main bridge crossing over Nile river measures about 150 meters in length with spans 50m, 90m, 50m with pre-stressed box section also the corridor includes statical Systems of pre-cast beams and box girders.

Owner: Engineering Authority for Armed Forces

Year: 2024

Explore More