A pre-cast beam bridge crossing over the Ring Road through the El Tagneed Corridor is a key component of the Misr El Gadida roads development. This bridge features continuous slabs over pre-cast beams with spans ranging from 26 to 31 meters and a steel bay over the Ring Road with a span of 50 meters. The total length of the bridge is about 700 meters.
Owner: Engineering Authority for Armed Forces
Year: 2020