A pre-cast beam bridge crossing over Orouba Road is one of the major infrastructure projects for Misr El Gadida roads. This bridge is noted for its large continuous pre-cast beam spans of 40 meters, 45 meters, and 40 meters, with other spans consisting of continuous slabs over pre-cast beams ranging from 26 to 31 meters. The total length of the bridge is approximately 525 meters.
Owner: Engineering Authority for Armed Forces
Year: 2020