The Integral Bridge over Lindenthahler Street in Leipzig features a 3-span hybrid design, combining a steel composite deck in the main span with pre-stressed concrete in the side spans. The deck is rigidly connected to steel columns, with the concrete section in the main span being pre-stressed both longitudinally and transversely. This innovative design is notable for its technical and aesthetic qualities. Dr. Fathy Saad was a member of the design team.
Main Structural Consultant: SBP/Stuttgart
Owner: Deutsche Bahn
Date: 1999 – 2003